Skip to content
KonarkIntegrated

We read the ground before you build on it.

Geotechnical investigation, soil testing and foundation advice for infrastructure across eastern India.

Borehole BH-04terminated 22.0 m
0.0
4.0
8.0
12.0
16.0
20.0
Filled up soil0.01.4 m · N = 4
Silty clay1.45.2 m · N = 11Firm, brown, medium plasticity
Laterite5.211.6 m · N = 32Dense, reddish brown, nodular
Weathered khondalite11.617.5 m · N > 50RQD 38%, core recovery 74%
Hard rock17.522.0 m · refusalRQD 81%, UCS 46 MPa
Laboratory
NABL scope
Rigs
11, all owned
Report draft
10 working days
Mobilisation
within a week
Boreholes drilled
1,200+
onshore, since 2014
Test methods
310
field + laboratory
States covered
9
eastern & central India
Engineers & technicians
48
on rolls

Five stages, each with a date attached

You always know which stage your job is in, and who on our side is holding it.

  1. Stage 1

    Enquire

    Send the site plan and the structure you intend to build. We reply with a scope, a borehole layout and a fixed price within two working days.

  2. Stage 2

    Mobilise

    Rig, crew and supervising engineer reach site. Positions are marked with DGPS and agreed with your representative before drilling starts.

  3. Stage 3

    Investigate

    Drilling, sampling and in-situ testing proceed under continuous supervision. Field logs are shared daily so you are never waiting in the dark.

  4. Stage 4

    Test

    Sealed samples reach the lab within 48 hours and are tested on calibrated equipment under NABL scope.

  5. Stage 5

    Report

    Factual and interpretative reports, with design parameters your structural consultant can use directly. Draft in 10 days, final after your comments.

Ground we have already been through

All projects

Six-lane river bridge approach

42 boreholes to 45 m through alluvium into weathered khondalite, MASW along the alignment, and pile capacity advice for 1.2 m bored piles.

Cuttack, Odisha/2025/45 m max depth

Steel plant raw material yard

Investigation across 60 acres, 1,000 t kentledge pile load test, and settlement monitoring of stockpile foundations.

Jajpur, Odisha/2025/1,000 t test load

Port berth and back-up area

Near-shore boreholes from a jack-up platform, cyclic triaxial testing, and liquefaction assessment for the berth structure.

Paradip, Odisha/2024/18 marine boreholes

400 kV transmission line

Tower-wise investigation across 210 km, soil resistivity for earthing design, and foundation type recommendation per tower.

Odisha – Chhattisgarh/2024/210 km corridor

Calibrated equipment, named technicians, retained samples

Our Bhubaneswar laboratory works to a NABL scope covering soil, rock, aggregate, concrete and water. Every certificate carries the method, the equipment ID and the technician who ran it. Samples are held for sixty days after reporting, so a result can always be re-checked.

310
test methods under scope
48 h
sample to lab, from site
0.01 mm
settlement resolution
60 days
sample retention

Send the site plan. Get a scope and a price in two days.

Tell us what you intend to build and where. We propose a borehole layout, a test schedule and a fixed cost. No obligation.